Our Experience

Recent LU Projects which the ARK Management team have undertaken the role of Lead Signalling Designer are:

  • Bespoke Signalling Training Facility for Tube Lines.
  • Piccadilly Line Extension to Heathrow Terminal 5.
  • Jubilee Line Upgrade Project (Stratford to Dollis Hill).
  • ‘S8’ Stock Enabling on the Metropolitan Line and ‘S7’ Stock Enabling at Edgware Road (Circle and H&C).
  • Extended Hours Project to modify Programme Machines.
  • Train Speed Inductor Replacements.

In addition the ARK Management and Design Team members have held key positions on the following projects:

London Underground

  • Provision of West Ham Reversing Facility – Category ‘S’ Approving.
  • Scheme Development for Whitechapel Remodelling – Category ‘S’ Approving.
  • Points and Crossings Renewals – Category ‘S’ Approving.
  • Compromised Overlap Mitigations – Category ‘S’ Approving.
  • East London Line Closure – Category ‘S’ Approving.
  • Wimbledon Branch SSR Upgrade Immunisation Works - Design Manager.

Network Rail

  • Guildford Area Resignalling – Senior Signalling Design Engineer.
  • Thameslink Programme, Blackfriars Area 24TPH Enabling Works – Senior Signalling Design Engineer.
  • London Bridge – Hither Green Remote Interlocking Renewal – Senior Signalling Design Engineer.
  • Channel Tunnel Rail Link, St Pancras – Senior Signalling Design Engineer.