London Underground District Line and Circle Line ‘S’ Stock Enabling
April 30, 2015
0

ARK were contracted to undertake legacy signalling scheme design and detailed design modifications at various sites to facilitate the introduction of longer ‘S’ Stock trains. This involved the re-location of numerous signals, trainstops and track circuit boundaries as well as the use of signalling enforced train speed control.

Leave a Reply